Skip to main content
Appendix C · Fee Resolution

Resolution No. 125

A RESOLUTION REPEALING RESOLUTION NO. 119 AND ESTABLISHING FEES PERTAINING TO CERTAIN CITY SERVICES, PERMITS, AND APPLICATIONS OFFERED BY THE CITY AND REFERENCED WITHIN THE CODE OF THE CITY OF LINN VALLEY, KANSAS.

WHEREAS, the City of Linn Valley, Kansas, presently charges for a variety of services, permits and applications; and

WHEREAS, fees are currently set forth in the Code of the City of Linn Valley, Kansas, having been authorized and formulated by the City Council at different times throughout the history of Linn Valley; and

WHEREAS, administration of the various fees would be simplified if all such fees would be consolidated into one resolution where both city staff and the citizens of the City of Linn Valley could determine the fees charged by the City;

NOW, THEREFORE, BE IT RESOLVED BY THE GOVERNING BODY OF THE CITY OF LINN VALLEY, KANSAS:

Section 1. The following list of fees shall be charged for the appropriate service, permit or application, as referenced by the Code of the City of Linn Valley, Kansas:

FEE DESCRIPTIONCODE SUBSECTIONFEE AMOUNT
Administration
Open Record Inspection Fee1-612Charged at the rate of $25 per hour per employee engaged in the record search, or a minimum $25 charge per request
Open Record Copying Fee1-613$0.25 per page
Animal Control
Dog License Fees2-102$3 fee per neutered male or spayed female dog; $8 for each intact male aor female dog. $25 kennel fee for three or more dogs per household
Overdue Dog License Fee2-104$10 per dog if not fee is not paid within the time required
Dog Tags2-202$8 fee for duplicate tag to replace lost or stolen tag
Dog Impoundment Fee2-124$25
Dog Boarding Fee2-125Boarding fee $20 per day in addition to other fines and fees
Cereal Malt Beverage Licenses
Cereal Malt Beverage License Fee3-207(a) General Retailer - $25 per calendar year (b) Limited Retailer - $25 per calendar year
Cereal Malt Beverage Location Change Application Fee3-211$25
Building Permits
Building Contractor Registration Fee4-103$50 fee per calendar year
Building Permit Application Fee4-202$35
Building Permit Base Fee4-202$75
Building Permit Fees – New Residential, and Non-residential Construction greater than 240 sq. ft.4-202Calculated using Exhibit A worksheet
Environmental Impact Fee4-202$500 for each water holding tank and sewer holding tank, in addition to the required permit fees.
Public Sewer System
Sewer Use Rates15-101The first billing cycle in January 2024 monthly rate of $60.90; rates will increase 2.5% annually. Billing cycle is 21st day of the month thru 20th day of the following month. Payments are due the 9th of the month. Payments not made by the due date will be charged a late penalty of $2.50 in addition to payment due.
High Volume Users Rates (250,000 or more gallons annual flow into city wastewater treatment facility)15-101Rate per 1000 gallons is $18.63; effective January 1, 2024, rates will increase 2.5% annually. Payment is due the 24th of the month. Late penalty is 5% of balance due.
Replace missing or damaged vent cap15-207$88.00
Replace missing or damaged control panel key lock15-207$25.00
Public Sewer System Connection Fee15-209$6,450 fee in 2024; annual increase 2.5%
EXHIBIT A
TOTAL VALUATIONFEES
$1.00 to $500.00$25.00
$501.00 to $2,000$25.00 for the first $500.00 plus $2.75 for each additional $100.00 or fraction thereof, to and including $2,000.00
$2,001.00 to $25,000.00$62.25 for the first $2.000.00 plus $12.50 for each additional $1,000.00 or fraction thereof, to and including $25,000.00
$25,001.00 to $50,000.00$349.75 for the first $25,000.00 plus $9.00 for each additional $1,000.00 or fraction thereof, to and including $50,000.00
$50,001.00 to $100,000.00$574.75 for the first $50,000.00 plus $6.25 for each additional $1,000.00 or fraction thereof, to and including $100,000.00
$100,001.00 to $500,000.00$887.25 for the first $100,000.00 plus $5.00 for each additional
$1,000.00 or fraction thereof, to and including $500,000.00
$500,001.00 to $1,000,000.00$2,887.25 for the first $500,000.00 plus $4.25 for each additional
$1,000.00 or fraction thereof, to and including $1,000,000.00
$1,000,000 and up$5,012.25 for the first $1,000,000.00 plus $2.75 for each additional
$1,000.00 or fraction thereof.
Manufactured housing fees are 50% of the fees for conventional housing.

Illustration

(12-11-2023)